Borlänge · Dalarna County · SE3

EcoDataCenter Borlänge

EcoDataCenter 2 in Borlänge. The 2025 annual report says EcoDC Borlänge AB is working on a new facility. On 11 February 2026 EcoDataCenter and Mistral AI announced a partnership to build an AI-focused data center at this same Borlänge site, with a stated €1.2 billion long-term commitment in Sweden’s digital infrastructure. EcoDataCenter is to design, build and operate; Mistral is to deploy AI compute, with a scheduled opening in 2027. That notice is attached here. It is not stored as a second campus. No megawatt figure is recorded from the cited pages.

In developmentGrid: Not published as a numbered connection in the cited annual-report extract or the 11 February 2026 partnership notice.

Fact box

Last checked
2026-09-11
Location accuracy
municipality · Approximate location

Approximate municipal location.

Phases

  • EcoDataCenter 2In development

Capacity disclosure

  • Announced capacity (definition unclear)

    Not stated in the cited sources

    Announced capacity (definition unclear) · current · 2026 · announced · campus

    Unclear / conflictingAs of 2026-09-11 · EcoDataCenter

    Checked the 2025 annual-report extract, the related Falun site page and the 11 February 2026 EcoDataCenter–Mistral notice. None of those pages states a Borlänge megawatt. The €1.2 billion figure is a long-term partnership commitment, not a published MW or a split capex line.

Planning and grid

Company work on a new facility is reported. The 2026 notice schedules an opening in 2027. Permit status and construction start are not verified here.

Not published as a numbered connection in the cited annual-report extract or the 11 February 2026 partnership notice.

Updates

  • 2026-02-11

    EcoDataCenter and Mistral AI announce a Borlänge partnership

    EcoDataCenter said it would design, build and operate an AI-focused data center at its existing Borlänge site, with Mistral deploying compute and a scheduled 2027 opening. The notice states a €1.2 billion long-term commitment. It is not stored as a second campus and does not publish a megawatt.

Knowledge gaps

  • No primary-source MW on the cited pages.
  • Construction start is not documented in those pages.
  • How the €1.2 billion long-term commitment is split between partners, capex and compute is not specified.
  • Falun campus figures are not added to this record.

Sources

  1. EcoDC Holding AB annual report 2025 (English) EcoDC Holding AB, 2026-04-01. Checked 2026-09-10.
  2. EcoDataCenter 1, Falun EcoDataCenter, 2026-01-01. Checked 2026-09-10.
  3. Mistral AI and EcoDataCenter Partner to Build AI-focused Data Center in Sweden EcoDataCenter, 2026-02-11. Checked 2026-09-11.