Stockholm · Stockholm County · SE3

Bahnhof Pionen

Bahnhof colocation hall under Vita bergen on Södermalm, described as a converted civil-defence shelter. Capacity is not stated on the cited pages.

OperationalGrid: Not disclosed on the cited Bahnhof pages.

Show on the map →

Fact box

Actor
Bahnhof
Status
Operational
Municipality / county
Stockholm · Stockholm County
Bidding zone
SE3
Last checked
2026-11-06
Location accuracy
District
EcoDataCenter Smedjebacken (Röbacken) — In developmentEcoDataCenter Norrsundet (Gävle) — ProposedData centre, Ockelbo (Vallhalla, Lingbo) — In developmentSunSpark data centre, Gotland (Visby) — ProposedMagnora data centre, Tranemo (Limmared) — ProposedPlanned data centre, Enköping (Ullunda) — ProposedMagnora data centre, Hultsfred (Nyhagen) — ProposedGoogle Horndal — Under constructionMicrosoft Gävle — OperationalMicrosoft Sandviken — OperationalEcoDataCenter Falun — Partially operationalEcoDataCenter Borlänge — Under constructionatNorth SWE01 Kista — OperationalatNorth SWE02 Akalla — In developmentEquinix SK1 — OperationalEquinix SK2 — OperationalEquinix SK3 — OperationalConapto Stockholm 3 North — OperationalDigital Realty Stockholm — OperationalSTACK STO01 Stockholm — OperationalBahnhof Thule — OperationalBahnhof Gullan — OperationalBahnhof S:t Erik — OperationalConapto Stockholm South — OperationalGleSYS Stockholm — Operationalevroc Arlandastad — Under constructionStockholm100 km
Approximate Södermalm / Vita bergen location. Operator publishes Renstiernas gata 37.

Phases

  • Pionen — Operational

Capacity disclosure

  • IT power

    Not stated in the cited sources

    IT power · current · 2026 · announced · building

    Unclear / conflictingAs of 2026-09-10 · Bahnhof

Planning and grid

Operating inner-city hall. Historic shelter conversion is operator-described.

Not disclosed on the cited Bahnhof pages.

Upcoming decisions and dates

  • 7 December 2026 · Scheduled

    Acceptance period ends for Telenor’s mandatory offer for Bahnhof

    Telenor’s unconditional cash offer of SEK 62 per share runs from 9 November to 7 December 2026 at 17:00 CET. Bahnhof operates five halls in the register.

    Source: Telenor Sverige AB

  • 14 December 2026 · Scheduled

    Expected settlement of Telenor’s offer for Bahnhof

    Telenor gives 14 December 2026 as the expected settlement date for shares tendered in the mandatory offer.

    Source: Telenor Sverige AB

The full decision calendar →

Updates

  • 2026-11-06

    Telenor completes acquisition of control of Bahnhof; mandatory offer at SEK 62

    Telenor Sverige said it has completed the acquisitions of 57.5 percent of the shares and 87.9 percent of the votes in Bahnhof, operator of Bahnhof Pionen, and published an unconditional mandatory cash offer of SEK 62 per share. Acceptance period 9 November–7 December 2026; expected settlement 14 December 2026.

  • 2026-11-02

    Konkurrensverket clears Telenor's acquisition of control of Bahnhof

    Konkurrensverket left Telenor Sverige's acquisition of sole control of Bahnhof, operator of Bahnhof Pionen, without action (dnr 677/2026). According to Telenor all regulatory conditions are met; the acquisitions cover 57.5 percent of the shares and 87.9 percent of the votes and are expected to complete shortly.

Context

More projects in Stockholm County

Related news

Knowledge gaps

  • MW not disclosed.
  • Occupied customer load unknown.
  • Telenor completed the controlling acquisition on 6 November 2026 and launched a mandatory offer at SEK 62; acceptance level and any squeeze-out are not yet known.