Stockholm · Stockholm County · SE3

GleSYS Stockholm

GleSYS hall in Västberga, Stockholm, described as carrier-neutral colocation and cloud infrastructure. The cited Stockholm page, read 28 October 2026, states 1 MW and 1,200 m² of colocation space without defining whether the megawatt is IT load, facility power or grid connection.

OperationalGrid: Not disclosed on the cited page.

Show on the map →

Fact box

Actor
GleSYS
Status
Operational
Municipality / county
Stockholm · Stockholm County
Bidding zone
SE3
Announced capacity (definition unclear)
1 MW · GleSYS
Last checked
2026-10-28
Location accuracy
District
EcoDataCenter Smedjebacken (Röbacken) — In developmentEcoDataCenter Norrsundet (Gävle) — ProposedData centre, Ockelbo (Vallhalla, Lingbo) — In developmentSunSpark data centre, Gotland (Visby) — ProposedMagnora data centre, Tranemo (Limmared) — ProposedPlanned data centre, Enköping (Ullunda) — ProposedMagnora data centre, Hultsfred (Nyhagen) — ProposedGoogle Horndal — Under constructionMicrosoft Gävle — OperationalMicrosoft Sandviken — OperationalEcoDataCenter Falun — Partially operationalEcoDataCenter Borlänge — Under constructionatNorth SWE01 Kista — OperationalatNorth SWE02 Akalla — In developmentEquinix SK1 — OperationalEquinix SK2 — OperationalEquinix SK3 — OperationalConapto Stockholm 3 North — OperationalDigital Realty Stockholm — OperationalSTACK STO01 Stockholm — OperationalBahnhof Pionen — OperationalBahnhof Thule — OperationalBahnhof Gullan — OperationalBahnhof S:t Erik — OperationalConapto Stockholm South — Operationalevroc Arlandastad — Under constructionStockholm100 km
Approximate Västberga location.

Phases

  • Västberga hall — Operational

Capacity disclosure

  • Announced capacity (definition unclear)

    1 MW

    Announced capacity (definition unclear) · current · 2026 · announced · building

    ReportedAs of 2026-10-28 · GleSYS

    Undated operator page, read 28 October 2026. The megawatt is not defined as IT load, facility power or grid connection.

    “1 MW Purpose-built data center designed for resilience and scalability, providing 1200 m² of premium colocation space.”

Planning and grid

Operating hall. Permit file not reviewed here.

Not disclosed on the cited page.

Updates

No material changes in the launch set.

Context

More projects in Stockholm County

Knowledge gaps

  • The 1 MW on the Stockholm page is not defined as IT load, facility power or grid connection.

Sources

  1. GleSYS Stockholm data center — GleSYS, 2026-01-01. Checked 2026-09-10.

Submit a documented update · Report an error