Stockholm · Stockholm County · SE3
GleSYS Stockholm
GleSYS hall in Västberga, Stockholm, described as carrier-neutral colocation and cloud infrastructure. The cited Stockholm page, read 28 October 2026, states 1 MW and 1,200 m² of colocation space without defining whether the megawatt is IT load, facility power or grid connection.
Fact box
- Actor
- GleSYS
- Status
- Operational
- Municipality / county
- Stockholm · Stockholm County
- Bidding zone
- SE3
- Announced capacity (definition unclear)
- 1 MW · GleSYS
- Last checked
- 2026-10-28
- Location accuracy
- District
Phases
- Västberga hall — Operational
Capacity disclosure
Announced capacity (definition unclear)
1 MW
Announced capacity (definition unclear) · current · 2026 · announced · building
ReportedAs of 2026-10-28 · GleSYS
Undated operator page, read 28 October 2026. The megawatt is not defined as IT load, facility power or grid connection.
“1 MW Purpose-built data center designed for resilience and scalability, providing 1200 m² of premium colocation space.”
Planning and grid
Operating hall. Permit file not reviewed here.
Not disclosed on the cited page.
Updates
No material changes in the launch set.
Context
- County: Stockholm County
- Municipality: Stockholm
- Electricity area: SE3
- Actors: GleSYS
More projects in Stockholm County
- atNorth SWE01 Kista — Operational
- atNorth SWE02 Akalla — In development
- Equinix SK1 — Operational
- Equinix SK2 — Operational
- Equinix SK3 — Operational
Knowledge gaps
- The 1 MW on the Stockholm page is not defined as IT load, facility power or grid connection.
Sources
- GleSYS Stockholm data center — GleSYS, 2026-01-01. Checked 2026-09-10.