Sollefteå · Västernorrland County · SE2

Cirenso site, Hamre (Sollefteå)

Existing industrial site at Hamre Industrial Park in Långsele, Sollefteå municipality, with about 4.7 MW of existing power capacity, owned through Cirenso Group AB and its subsidiaries Cirenso Property AB and Cirenso Operations AB. Vertical Data Nordic AB bought Cirenso on 22 September 2026 for SEK 60.0 million and on 17 November 2026 sold 95 per cent to a joint venture controlled by affiliates of an unnamed private equity fund. The owners hold a pending application with the regional grid operator for up to 100 MW. This is a different site from atNorth's SWE04 in the same industrial park.

In developmentGrid: About 4.7 MW of existing power capacity according to the 8-K (the September 2026 notice said 4.5 MW); whether it is grid, facility or IT power is not stated. A pending application with the regional grid operator for a connection of up to 100 MW of total capacity; the grid operator is not named and no decision is published.

Show on the map →

Fact box

Status
In development
Municipality / county
Sollefteå · Västernorrland County
Bidding zone
SE2
Announced capacity (definition unclear)
4.7 MW · U.S. Securities and Exchange Commission (EDGAR) / Vertical Data Inc.
Last checked
2026-11-25
Location accuracy
District
Arcem data centre, Strömsund (Hoting) — ProposedGoogle Torsboda, Timrå — AnnouncedRoofscapes data centre, Bräcke — AnnouncedVerda AI centre, Sundsvall (Almåsen) — AnnouncedEdgeConneX Skellefteå — In developmentatNorth SWE04 Sollefteå — In developmentSollefteå100 km
Pin placed at Hamre in Långsele (OpenStreetMap). The filings name Hamre Industrial Park but not the property; the exact plot is not marked.

Phases

    Capacity disclosure

    • Announced capacity (definition unclear)

      4.7 MW

      Announced capacity (definition unclear) · current · 2026 · announced · campus

      ReportedAs of 2026-11-17 · U.S. Securities and Exchange Commission (EDGAR) / Vertical Data Inc.

      Company filing. Not defined as grid, facility or IT power, and not stated to be in use. The 11 September 2026 notice gave 4.5 MW. The pending application for up to 100 MW is not a granted connection and is not added.

      “approximately 4.7 MW of existing power capacity”

    Planning and grid

    No municipal planning or permit document for a data centre on the site is reviewed here. The filings describe an existing industrial site.

    About 4.7 MW of existing power capacity according to the 8-K (the September 2026 notice said 4.5 MW); whether it is grid, facility or IT power is not stated. A pending application with the regional grid operator for a connection of up to 100 MW of total capacity; the grid operator is not named and no decision is published.

    Updates

    • 2026-11-17

      95 per cent of the Hamre site company sold to a joint venture controlled by an unnamed private equity fund

      Vertical Data Nordic AB sold 95 per cent of Cirenso Group AB and two loans to a Swedish company owned by a Luxembourg partnership, in which affiliates of a global private equity fund hold 95 per cent and Vertical Edge 5 per cent. The total price was about SEK 54.3 million. Vertical Data Nordic keeps 5 per cent of Cirenso. The buyer may decide on financing and on a sale of the company.

    • 2026-09-22

      Vertical Data Nordic buys Cirenso, owner of the Hamre site, for SEK 60 million

      Vertical Data's majority-owned Swedish subsidiary Vertical Data Nordic AB acquired all shares in Cirenso Group AB for SEK 60.0 million under a share purchase agreement of 14 August 2026. Cirenso's subsidiaries own an industrial site at Hamre Industrial Park in Sollefteå with about 4.7 MW of existing power capacity.

    Context

    More projects in Västernorrland County

    Related news

    Knowledge gaps

    • The private equity fund that controls the joint venture is not named.
    • The regional grid operator, the date of the 100 MW application and its status are not published.
    • The property designation, the earlier use of the site and whether the 4.7 MW is in use are not stated.
    • No investment decision, customer, building plan or timetable is published.
    • The tax proceedings in Cirenso Operations AB referred to in the 8-K are not described.