  "name": "DataCenterSweden project register",
  "url": "https://datacentersweden.se/projects/",
  "asOf": "2026-11-13",
  "license": "Free to reuse with attribution to DataCenterSweden (datacentersweden.se) and a link to the project page. Every fact carries its own source; check the source before relying on it.",
  "notes": [
    "Unknown values are null, never zero.",
    "MW figures keep their metric type (IT, facility, site, utility). Do not add different types together.",
    "Coordinates are approximate (municipality or district level)."
  ],
  "projects": [
    {
      "id": "prj-magnora-hylte-hyltebruk",
      "name": "Data centre, Hylte (Hyltebruk, Västra Åkralt)",
      "url": "https://datacentersweden.se/projects/magnora-hylte-hyltebruk/",
      "stage": "development",
      "municipality": "Hylte",
      "county": "Halland County",
      "electricityArea": "",
      "locationAccuracy": "district",
      "lat": 56.9993,
      "lon": 13.2294,
      "actors": [
        "Magnora Data Center"
      ],
      "headlineCapacity": {
        "value": 60,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "designed",
        "asOf": "2026-10-21",
        "source": "https://www.hylte.se/download/18.36c404591a1631534a1c526/1793267399404/Protokoll%20SBN%202026-10-21%20R.pdf"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": 60,
          "unit": "MW",
          "scope": "building",
          "basis": "designed",
          "asOf": "2026-10-21",
          "evidence": "reported",
          "source": "https://www.hylte.se/download/18.36c404591a1631534a1c526/1793267399404/Protokoll%20SBN%202026-10-21%20R.pdf"
        }
      ],
      "gridStatus": "A control building of 300 square metres, an outdoor switchyard and two large transformer stations form a receiving station that is to supply the data centre, according to the permit minutes. Power is supplemented by 48 EPOD units with diesel backup generators. According to the municipality and the company (12 November 2026), the grid installation is being designed together with the regional network owner E.ON, and the connection to the regional network is to be examined through an application for a network concession at the Energy Markets Inspectorate. No connection agreement, capacity or connection date is published.",
      "planningStatus": "Detailed plan Hyltebruk 618 for industry and business, in legal force since 20 July 2023. Building permits for the data centre and the control building granted on 21 October 2026. According to the minutes, the decisions gain legal force four weeks after publication of the notice, or three weeks after service on neighbours, unless appealed; the municipality expects legal force at the end of November 2026. An operating permit for the facility, including backup power, is to be examined by the County Administrative Board of Halland; dialogue is ongoing. No start notice is published.",
      "sources": [
        "https://www.hylte.se/download/18.36c404591a1631534a1c526/1793267399404/Protokoll%20SBN%202026-10-21%20R.pdf",
        "https://www.sverigesradio.se/artikel/byggplanen-stort-datacenter-i-hylte-kan-ge-400-jobb",
        "https://www.sverigesradio.se/artikel/hemligt-vilka-som-kommer-hyra-in-sig-pa-planerade-datacentret",
        "https://www.hylte.se/nyheter/nyhetsarkiv/2026-11-12-information-om-planerat-projekt-datacenter-i-hyltebruk",
        "https://www.hylte.se/download/18.7d5666ac1a1cad22ea01cc5/1794488020065/Datacenter_Hyltebruk_information.pdf",
        "https://magnoradc.com/company-portfolio/"
      ],
      "lastCheckedAt": "2026-11-13",
      "lastMaterialUpdateAt": "2026-11-12"
    },
    {
      "id": "prj-panattoni-hassleholm-nord",
      "name": "Panattoni data centre, Hässleholm Nord",
      "url": "https://datacentersweden.se/projects/panattoni-hassleholm-nord/",
      "stage": "proposed",
      "municipality": "Hässleholm",
      "county": "Skåne County",
      "electricityArea": "SE4",
      "locationAccuracy": "municipality",
      "lat": 56.185,
      "lon": 13.79,
      "actors": [
        "Panattoni"
      ],
      "headlineCapacity": {
        "value": 300,
        "unit": "MW",
        "metricType": "announced_capacity_unclear",
        "basis": "announced",
        "asOf": "2026-11-02",
        "source": "https://www.hassleholm.se/bygga-bo-och-miljo/stadsutveckling-oversiktsplan-och-detaljplaner/stadsutveckling/hassleholm-nord/fragor-och-svar-planerad-datacenteretablering"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 300,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-11-02",
          "evidence": "documented",
          "source": "https://www.hassleholm.se/bygga-bo-och-miljo/stadsutveckling-oversiktsplan-och-detaljplaner/stadsutveckling/hassleholm-nord/fragor-och-svar-planerad-datacenteretablering"
        }
      ],
      "gridStatus": "E.ON has given a first positive connection indication of 150 MW for around 2033. Panattoni intends to apply for a further 150 MW. E.ON's grid study is expected to take 6 to 18 months, followed by a preliminary study of 3 to 9 months. An indication is not a connection agreement.",
      "planningStatus": "Letter of intent approved by the municipal executive committee on 10 June 2026 (item 126). It is not legally binding and either party can end it. The municipality is changing the detailed plan for a new main entrance to Hässleholm Nord from the Stoby interchange via Stobyvägen; no date is given for that plan.",
      "sources": [
        "https://www.hassleholm.se/bygga-bo-och-miljo/stadsutveckling-oversiktsplan-och-detaljplaner/stadsutveckling/hassleholm-nord/fragor-och-svar-planerad-datacenteretablering",
        "https://www.hassleholm.se/alla-nyheter/nyheter/2026-06-04-stor-datacentersatsning-kan-bli-verklighet-pa-hassleholm-nord"
      ],
      "lastCheckedAt": "2026-11-11",
      "lastMaterialUpdateAt": "2026-06-10"
    },
    {
      "id": "prj-google-torsboda",
      "name": "Google Torsboda, Timrå",
      "url": "https://datacentersweden.se/projects/google-torsboda-timra/",
      "stage": "announced",
      "municipality": "Timrå",
      "county": "Västernorrland County",
      "electricityArea": "SE2",
      "locationAccuracy": "municipality",
      "lat": 62.52,
      "lon": 17.39,
      "actors": [
        "Google"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-16",
        "source": "https://sundsvall.se/kommun/kommun-och-politik/press--och-informationsmaterial/kommunen-forklarar/kommunen-forklarar/2026-06-18-storsatsning-pa-datacenter-i-torsboda---vad-det-betyder-for-sundsvall"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-16",
          "evidence": "unclear",
          "source": "https://sundsvall.se/kommun/kommun-och-politik/press--och-informationsmaterial/kommunen-forklarar/kommunen-forklarar/2026-06-18-storsatsning-pa-datacenter-i-torsboda---vad-det-betyder-for-sundsvall"
        }
      ],
      "gridStatus": "Sundsvall municipality's explainer gives no power figure. It says E.ON states that new customers pay for their own connection and that capacity is reserved for other planned projects under current assumptions.",
      "planningStatus": "Sale approved by both councils on 17 August 2026, conditional on renegotiated repurchase terms; if the renegotiation fails the matter returns to the councils. A private individual has appealed Timrå's decision to the administrative court. Remaining steps named by the municipality: contract, permits, environmental review, building permits, energy supply and review by the Inspectorate of Strategic Products.",
      "sources": [
        "https://sundsvall.se/kommun/kommun-och-politik/press--och-informationsmaterial/kommunen-forklarar/kommunen-forklarar/2026-06-18-storsatsning-pa-datacenter-i-torsboda---vad-det-betyder-for-sundsvall"
      ],
      "lastCheckedAt": "2026-11-11",
      "lastMaterialUpdateAt": "2026-08-17"
    },
    {
      "id": "prj-ecodc-smedjebacken",
      "name": "EcoDataCenter Smedjebacken (Röbacken)",
      "url": "https://datacentersweden.se/projects/ecodatacenter-smedjebacken/",
      "stage": "development",
      "municipality": "Smedjebacken",
      "county": "Dalarna County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 60.142,
      "lon": 15.411,
      "actors": [
        "EcoDataCenter"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-08-25",
        "source": "https://ecodatacenter.tech/press/ecodatacenter-etablerar-sig-i-smedjebackens-kommun-strker-dalarnas-position-som-ledande-infrastrukturregion-i-sverige-3462221"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-08-25",
          "evidence": "unclear",
          "source": "https://ecodatacenter.tech/press/ecodatacenter-etablerar-sig-i-smedjebackens-kommun-strker-dalarnas-position-som-ledande-infrastrukturregion-i-sverige-3462221"
        }
      ],
      "gridStatus": "The operator's release gives no power figure or grid agreement. It says Smedjebacken has access to renewable electricity from hydro and wind power.",
      "planningStatus": "Option agreement on 52 hectares announced 25 August 2026; the municipality and the operator have had a letter of intent since 2019. Construction requires a building permit and an environmental permit, which the operator expects during 2027. The release does not say whether applications have been filed.",
      "sources": [
        "https://ecodatacenter.tech/press/ecodatacenter-etablerar-sig-i-smedjebackens-kommun-strker-dalarnas-position-som-ledande-infrastrukturregion-i-sverige-3462221"
      ],
      "lastCheckedAt": "2026-11-11",
      "lastMaterialUpdateAt": "2026-08-25"
    },
    {
      "id": "prj-fossefall-jokkmokk",
      "name": "Fossefall AI factory, Jokkmokk",
      "url": "https://datacentersweden.se/projects/fossefall-jokkmokk/",
      "stage": "development",
      "municipality": "Jokkmokk",
      "county": "Norrbotten County",
      "electricityArea": "SE1",
      "locationAccuracy": "municipality",
      "lat": 66.606,
      "lon": 19.838,
      "actors": [
        "Fossefall"
      ],
      "headlineCapacity": {
        "value": 65,
        "unit": "MW",
        "metricType": "utility_power",
        "basis": "contracted",
        "asOf": "2026-11-10",
        "source": "https://www.fossefall.ai/news/fossefall-secures-grid-capacity-for-ai-factory-in-jokkmokk"
      },
      "metrics": [
        {
          "metricType": "utility_power",
          "value": 65,
          "unit": "MW",
          "scope": "campus",
          "basis": "contracted",
          "asOf": "2026-11-10",
          "evidence": "documented",
          "source": "https://www.fossefall.ai/news/fossefall-secures-grid-capacity-for-ai-factory-in-jokkmokk"
        },
        {
          "metricType": "announced_capacity_unclear",
          "value": 200,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-11-10",
          "evidence": "reported",
          "source": "https://www.fossefall.ai/news/fossefall-secures-grid-capacity-for-ai-factory-in-jokkmokk"
        }
      ],
      "gridStatus": "Grid connection agreement with Vattenfall Eldistribution AB signed according to Fossefall (announced 10 November 2026): 65 MW secured, potential for a further 135 MW. Vattenfall Eldistribution is to carry out the grid works; Fossefall invests in the connection. Connection date not stated.",
      "planningStatus": "Fossefall says the area is planned for industrial use. Jokkmokk Municipality wrote in May 2026 that it has handled the detailed-plan process for the area over several years and that the plan was financed by the developer. The plan itself, its legal-force date and any environmental permitting have not been checked.",
      "sources": [
        "https://www.fossefall.ai/news/fossefall-secures-grid-capacity-for-ai-factory-in-jokkmokk",
        "https://news.cision.com/se/fossefall/r/fossefall-sakrar-natkapacitet-for-ai-fabrik-i-jokkmokk,c4422467",
        "https://www.fossefall.ai/news/fossefall-moves-into-sweden-laying-the-foundation-for-large-scale-sovereign-ai-infrastructure-in-jokkmokk",
        "https://www.mynewsdesk.com/se/jokkmokk/pressreleases/jokkmokk-staerker-positionen-inom-framtidens-ai-och-datacenteretableringar-3447879"
      ],
      "lastCheckedAt": "2026-11-10",
      "lastMaterialUpdateAt": "2026-11-10"
    },
    {
      "id": "prj-ecodc-norrsundet",
      "name": "EcoDataCenter Norrsundet (Gävle)",
      "url": "https://datacentersweden.se/projects/ecodatacenter-norrsundet/",
      "stage": "proposed",
      "municipality": "Gävle",
      "county": "Gävleborg County",
      "electricityArea": "",
      "locationAccuracy": "district",
      "lat": 60.93,
      "lon": 17.141,
      "actors": [
        "EcoDataCenter"
      ],
      "headlineCapacity": null,
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-11-10",
          "evidence": "unclear",
          "source": "https://www.smhi.se/om-smhi/regeringsuppdrag-och-remissvar/remissvar/remisser/2026-10-30-yttrande-over-inbjudan-till-avgransnings--och-sevesosamrad---ansokan-om-miljotillstand-for-anlaggning-och-drift-av-datacenter-i-gavle-kommun"
        }
      ],
      "gridStatus": "No network owner, capacity, connection agreement or connection date is published in the sources reviewed.",
      "planningStatus": "Consultation under chapter 6 of the Environmental Code held ahead of a permit application, including a Seveso consultation; comments requested by 11 October 2026. No application is reported as filed. The detailed-plan position of the site has not been checked.",
      "sources": [
        "https://ecodatacenter.tech/samrad",
        "https://www.smhi.se/om-smhi/regeringsuppdrag-och-remissvar/remissvar/remisser/2026-10-30-yttrande-over-inbjudan-till-avgransnings--och-sevesosamrad---ansokan-om-miljotillstand-for-anlaggning-och-drift-av-datacenter-i-gavle-kommun",
        "https://www.gd.se/gavle/stort-datacenter-planeras-utanfor-gavle/",
        "https://www.gd.se/gavle/oron-i-grannskapet-datacentret-kan-borja-byggas-om-ett-ar/"
      ],
      "lastCheckedAt": "2026-11-10",
      "lastMaterialUpdateAt": "2026-10-30"
    },
    {
      "id": "prj-ockelbo-vallhalla-lingbo",
      "name": "Data centre, Ockelbo (Vallhalla, Lingbo)",
      "url": "https://datacentersweden.se/projects/ockelbo-vallhalla-lingbo/",
      "stage": "development",
      "municipality": "Ockelbo",
      "county": "Gävleborg County",
      "electricityArea": "",
      "locationAccuracy": "district",
      "lat": 61.032,
      "lon": 16.682,
      "actors": [],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-11-02",
        "source": "https://ockelbo.se/kommun--politik/beslut--handlingar/anslagstavla/anslagstavla/2026-10-19-bygglov-for-nybyggnad-av-datacenter-kontor-vakthus-vattenreningsverk-med-byggnad-och-tankar-sprinkleranlaggning-med-byggnad-och-tankar-garage-stallverk-med-byggnader-transformatorstation-och-mur-samt-parkering-har-beviljats-pa-fastighet-vallhalla-1125-fallasvagen-51-i-ockelbo-kommun"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-11-02",
          "evidence": "unclear",
          "source": "https://ockelbo.se/kommun--politik/beslut--handlingar/anslagstavla/anslagstavla/2026-10-19-bygglov-for-nybyggnad-av-datacenter-kontor-vakthus-vattenreningsverk-med-byggnad-och-tankar-sprinkleranlaggning-med-byggnad-och-tankar-garage-stallverk-med-byggnader-transformatorstation-och-mur-samt-parkering-har-beviljats-pa-fastighet-vallhalla-1125-fallasvagen-51-i-ockelbo-kommun"
        }
      ],
      "gridStatus": "According to the plan description, Ellevio's Grönviken switching station north of the plan area is intended to supply it, and Ellevio is planning two new 145 kV overhead lines between Grönviken and Ockelbo. The municipality wrote in May 2024 that the site is in bidding area SE2. No capacity, connection agreement or connection date is published.",
      "planningStatus": "Detailed plan VGS-PLAN 2024-000004 adopted by the municipal council and in legal force since 9 July 2026. Building permit for the data centre granted 16 October 2026 and posted on the notice board 19 October; transformer-station permit granted 23 October 2026. Per the municipality, decisions gain legal force when they have been published for 28 days. No start notice is published.",
      "sources": [
        "https://ockelbo.se/kommun--politik/beslut--handlingar/anslagstavla/anslagstavla/2026-10-19-bygglov-for-nybyggnad-av-datacenter-kontor-vakthus-vattenreningsverk-med-byggnad-och-tankar-sprinkleranlaggning-med-byggnad-och-tankar-garage-stallverk-med-byggnader-transformatorstation-och-mur-samt-parkering-har-beviljats-pa-fastighet-vallhalla-1125-fallasvagen-51-i-ockelbo-kommun",
        "https://ockelbo.se/kommun--politik/beslut--handlingar/anslagstavla/anslagstavla/2026-10-23-bygglov-for-nybyggnad-av-transformatorstation-har-beviljats-pa-fastighet-vallhalla-1125-fallasvagen-51-i-ockelbo-kommun",
        "https://ockelbo.se/bo-miljo--trafik/vgs/samhallsplanering/detaljplanering/pagaende-planarbeten/pagaende-detaljplaner-ockelbo-kommun/detaljplan-for-vallhalla-industriomrade",
        "https://ockelbo.se/download/18.50f2538119ed430e907e83c6/1784533838752/VGS-PLAN%25202024-000004%2520Planbeskrivning.pdf",
        "https://ockelbo.se/download/18.50f2538119ed430e907e83cd/1784533840760/VGS-PLAN%25202024-000004%2520Fastighetskonsekvensbeskrivning.pdf",
        "https://ockelbo.se/nyheter/nyheter/2024-05-31-foretag-undersoker-mojligheterna-att-etablera-datacenter-i-lingbo",
        "https://ockelbo.se/bo-miljo--trafik/vgs/bygga-nytt-andra-eller-riva/beviljade-bygglov",
        "https://www.kuxa.se/nyheter/2026/9/17/ldhmca6fhsib1nmxmb6t8z1t7ih7l0"
      ],
      "lastCheckedAt": "2026-11-02",
      "lastMaterialUpdateAt": "2026-10-23"
    },
    {
      "id": "prj-therma-loop-halmstad-kistinge",
      "name": "Therma Loop data centre, Halmstad (Kistinge)",
      "url": "https://datacentersweden.se/projects/therma-loop-halmstad-kistinge/",
      "stage": "proposed",
      "municipality": "Halmstad",
      "county": "Halland County",
      "electricityArea": "SE4",
      "locationAccuracy": "municipality",
      "lat": 56.674,
      "lon": 12.857,
      "actors": [],
      "headlineCapacity": {
        "value": 10,
        "unit": "MW",
        "metricType": "utility_power",
        "basis": "announced",
        "asOf": "2026-10-30",
        "source": "https://www.halmstad.se/download/18.3f0f35521a0adc200e0f2cc/1789653915056/260922-ksu-handlingar-gdpr-%C3%A4rende%2013-17.pdf"
      },
      "metrics": [
        {
          "metricType": "utility_power",
          "value": 10,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-10-30",
          "evidence": "reported",
          "source": "https://www.halmstad.se/download/18.3f0f35521a0adc200e0f2cc/1789653915056/260922-ksu-handlingar-gdpr-%C3%A4rende%2013-17.pdf"
        }
      ],
      "gridStatus": "The officer's report says the energy companies must be able to deliver at least 10 MW of connected power to the data centre. No grid company, connection agreement or connection date is named. A HEM presentation mentions a first phase of 10 MW for a \"small data centre Fyllinge\", possible to double when more power is available.",
      "planningStatus": "The property has a detailed plan for industrial use. Letter of intent backed by the community-development committee on 22 September 2026 (case KS 2026/00451); it is conditional on a decision that gains legal force. The company is to say before 30 April 2027 whether it wants to buy the land; otherwise the letter lapses. The next step would be a reservation agreement.",
      "sources": [
        "https://www.natomraden.se/",
        "https://www.halmstad.se/nyheter/nyhetsarkiv/merverksamhetsmarkochnyaforetagsetableringar.22998.html",
        "https://www.halmstad.se/download/18.3f0f35521a0adc200e0f2cc/1789653915056/260922-ksu-handlingar-gdpr-%C3%A4rende%2013-17.pdf",
        "https://www.hem.se/globalassets/dokument/fjarrvarme/prisdialogen-mote-nr-1-2026.pdf"
      ],
      "lastCheckedAt": "2026-10-30",
      "lastMaterialUpdateAt": "2026-09-22"
    },
    {
      "id": "prj-sunspark-gotland-visby",
      "name": "SunSpark data centre, Gotland (Visby)",
      "url": "https://datacentersweden.se/projects/sunspark-gotland-visby/",
      "stage": "proposed",
      "municipality": "Gotland",
      "county": "Gotland County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 57.638,
      "lon": 18.298,
      "actors": [],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-29",
        "source": "https://sammantraden.gotland.se/api/v2.0/meetings/51980/download/Protocol?downloadMode=download"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-10-29",
          "evidence": "unclear",
          "source": "https://sammantraden.gotland.se/api/v2.0/meetings/51980/download/Protocol?downloadMode=download"
        }
      ],
      "gridStatus": "No capacity, grid connection or connection date is given in the region's documents. The company links the data centres to its planned solar parks on Gotland.",
      "planningStatus": "Direct land allocation decided by the regional executive board on 21 April 2026 (item 155, case RS 2026/259); minutes posted 29 April to 21 May 2026. A land allocation agreement valid for two years is to be decided by the board; none was found in the board's agendas from May to 26 October 2026. According to the officer's report, the area already has a detailed plan.",
      "sources": [
        "https://www.natomraden.se/",
        "https://sammantraden.gotland.se/api/v2.0/meetings/51980/download/Protocol?downloadMode=download",
        "https://sammantraden.gotland.se/welcome-sv/namnder-styrelser/regionstyrelsen/2026-04-21-regionstyrelsen/agenda/tsf-tjansteskrivelse-forfragan-om-markanvisningar-i-visbypdf?downloadMode=open",
        "https://gotland.se/arkiv/nyheter/region-och-politik/2026-04-21-regionstyrelsebeslut-satsningar-pa-barn-bostader-och-jobb"
      ],
      "lastCheckedAt": "2026-10-29",
      "lastMaterialUpdateAt": "2026-04-21"
    },
    {
      "id": "prj-magnora-tranemo-limmared",
      "name": "Magnora data centre, Tranemo (Limmared)",
      "url": "https://datacentersweden.se/projects/magnora-tranemo-limmared/",
      "stage": "proposed",
      "municipality": "Tranemo",
      "county": "Västra Götaland County",
      "electricityArea": "",
      "locationAccuracy": "district",
      "lat": 57.537,
      "lon": 13.357,
      "actors": [],
      "headlineCapacity": {
        "value": 50,
        "unit": "MW",
        "metricType": "site_power",
        "basis": "announced",
        "asOf": "2026-10-28",
        "source": "https://tranemo.se/download/18.76ec1c051a1156e10473f4/1791789642321/Handlingar%20KS%202026-10-15.pdf"
      },
      "metrics": [
        {
          "metricType": "site_power",
          "value": 50,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-10-28",
          "evidence": "reported",
          "source": "https://tranemo.se/download/18.76ec1c051a1156e10473f4/1791789642321/Handlingar%20KS%202026-10-15.pdf"
        }
      ],
      "gridStatus": "The officer's report says the company has had indications from Vattenfall of capacity of up to 50 MW. The company submission says an application to Vattenfall for 50 MW has been filed and that it plans its own 130 kV receiving station. No connection agreement or connection date is documented.",
      "planningStatus": "The area has a detailed plan for industry. The executive committee referred the land case back to the general committee on 15 October 2026 (item 203, case KS/2026:415); minutes posted 19 October to 10 November. The administration had proposed a land allocation agreement; none has been decided.",
      "sources": [
        "https://tranemo.se/download/18.3ef958f71a12f5f33ebd7aa6/1792394269752/Protokoll%20KS%202026-10-15%20-%20signerat.pdf",
        "https://tranemo.se/download/18.76ec1c051a1156e10473f4/1791789642321/Handlingar%20KS%202026-10-15.pdf"
      ],
      "lastCheckedAt": "2026-10-28",
      "lastMaterialUpdateAt": "2026-10-15"
    },
    {
      "id": "prj-sunspark-torsas-soderakra",
      "name": "SunSpark data centre, Torsås (Söderåkra)",
      "url": "https://datacentersweden.se/projects/sunspark-torsas-soderakra/",
      "stage": "proposed",
      "municipality": "Torsås",
      "county": "Kalmar County",
      "electricityArea": "SE4",
      "locationAccuracy": "district",
      "lat": 56.446,
      "lon": 16.071,
      "actors": [],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-27",
        "source": "https://diariet.torsas.se/#!/search?t=4&d=45822&n=KS"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-10-27",
          "evidence": "unclear",
          "source": "https://diariet.torsas.se/#!/search?t=4&d=45822&n=KS"
        }
      ],
      "gridStatus": "No capacity, grid connection or connection date is given. The minutes say connection to district heating and municipal water and sewage at Pårydsvägen is possible.",
      "planningStatus": "Positive planning decision by the municipal executive committee on 24 March 2026 (item 74, case 2026/000064); minutes posted 26 March to 17 April. The detailed plan is to be drawn up by a planning consultant at the applicant's expense. Five studies are named, including a siting study for farmland. On 7 September 2026 the municipality registered new site proposals from the company; they are not published.",
      "sources": [
        "https://www.natomraden.se/",
        "https://diariet.torsas.se/#!/search?t=4&d=45822&n=KS",
        "https://diariet.torsas.se/#!/search?t=4&d=45709&n=KS",
        "https://diariet.torsas.se/#!/search?t=2&n=KS&r=2026000064"
      ],
      "lastCheckedAt": "2026-10-27",
      "lastMaterialUpdateAt": "2026-09-07"
    },
    {
      "id": "prj-enkoping-ullunda",
      "name": "Planned data centre, Enköping (Ullunda)",
      "url": "https://datacentersweden.se/projects/enkoping-ullunda/",
      "stage": "proposed",
      "municipality": "Enköping",
      "county": "Uppsala County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.642,
      "lon": 17.023,
      "actors": [],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-27",
        "source": "https://politik.enkoping.se/welcome-sv/namnder-styrelser/kommunstyrelsens-plex-utskott/kommunstyrelsens-plex-utskott-den-30-september-2026/agenda/pm-inriktningsbeslutpdf?downloadMode=open"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-10-27",
          "evidence": "unclear",
          "source": "https://politik.enkoping.se/welcome-sv/namnder-styrelser/kommunstyrelsens-plex-utskott/kommunstyrelsens-plex-utskott-den-30-september-2026/agenda/pm-inriktningsbeslutpdf?downloadMode=open"
        }
      ],
      "gridStatus": "No capacity, grid connection or connection date is given. The memo lists an electricity capacity study among the surveys that may be needed. On 20 October 2026 Vattenfall, E.ON and Svenska kraftnät briefed the executive board on grid capacity in the municipality and the region, at an overall and fictional level (item 254).",
      "planningStatus": "Development project started by the planning, land and development committee on 30 September 2026 (item 93, case KS2026/829); last day for appeals 29 October 2026. A preliminary agreement with the developer is signed. A planning decision is to be sought; detailed-plan work is expected to start in the fourth quarter of 2026 if it is granted. A land allocation agreement may be signed directly with the developer at the planning decision.",
      "sources": [
        "https://www.natomraden.se/",
        "https://politik.enkoping.se/committees/kommunstyrelsens-plex-utskott/kommunstyrelsens-plex-utskott-den-30-september-2026/protocol/protokollpdf?downloadMode=open",
        "https://politik.enkoping.se/welcome-sv/namnder-styrelser/kommunstyrelsens-plex-utskott/kommunstyrelsens-plex-utskott-den-30-september-2026/agenda/pm-inriktningsbeslutpdf?downloadMode=open",
        "https://politik.enkoping.se/committees/kommunstyrelsen/kommunstyrelsen-20-oktober-2026/protocol/protokoll-ks-2026-10-20pdf?downloadMode=open"
      ],
      "lastCheckedAt": "2026-10-27",
      "lastMaterialUpdateAt": "2026-09-30"
    },
    {
      "id": "prj-magnora-hultsfred",
      "name": "Magnora data centre, Hultsfred (Nyhagen)",
      "url": "https://datacentersweden.se/projects/magnora-hultsfred-nyhagen/",
      "stage": "proposed",
      "municipality": "Hultsfred",
      "county": "Kalmar County",
      "electricityArea": "",
      "locationAccuracy": "district",
      "lat": 57.503,
      "lon": 15.819,
      "actors": [],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-26",
        "source": "https://www.hultsfred.se/files/2026/09/Protokoll_ks_20260901_webb.pdf"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-10-26",
          "evidence": "unclear",
          "source": "https://www.hultsfred.se/files/2026/09/Protokoll_ks_20260901_webb.pdf"
        }
      ],
      "gridStatus": "The minutes say the municipality has held close talks with the grid owner E.ON. No capacity, grid connection or connection date is given.",
      "planningStatus": "Letter of intent approved by the municipal executive committee on 1 September 2026 (item 108, case 2026/208); minutes posted 3 to 29 September. Step 2, ahead of a sale, may begin only after a decision by the working committee. A sale would go to the municipal council.",
      "sources": [
        "https://www.hultsfred.se/files/2026/09/Protokoll_ks_20260901_webb.pdf",
        "https://www.hultsfred.se/files/2026/10/Kallelse_ks_20261027.pdf"
      ],
      "lastCheckedAt": "2026-10-26",
      "lastMaterialUpdateAt": "2026-09-01"
    },
    {
      "id": "prj-roofscapes-bracke",
      "name": "Roofscapes data centre, Bräcke",
      "url": "https://datacentersweden.se/projects/roofscapes-bracke/",
      "stage": "announced",
      "municipality": "Bräcke",
      "county": "Jämtland County",
      "electricityArea": "SE2",
      "locationAccuracy": "municipality",
      "lat": 62.751,
      "lon": 15.42,
      "actors": [
        "Roofscapes AB"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-23",
        "source": "https://brackekommun.ondemand.formpipe.com/welcome-sv/namnder-styrelser/kommunfullmaktige/kommunfullmaktige/agenda/tjansteskrivelsepdf-92931?downloadMode=open"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-10-23",
          "evidence": "unclear",
          "source": "https://brackekommun.ondemand.formpipe.com/welcome-sv/namnder-styrelser/kommunfullmaktige/kommunfullmaktige/agenda/tjansteskrivelsepdf-92931?downloadMode=open"
        }
      ],
      "gridStatus": "No contracted capacity, grid connection or connection date is given in the municipal documents used here.",
      "planningStatus": "Land sale decided by the municipal council on 21 October 2026 (item 106, case KSK 2025/539); the minutes were approved and posted on 23 October. The land is part of an ongoing detailed-plan process for industrial use, paid for by Roofscapes under a plan-cost agreement of 10 December 2025.",
      "sources": [
        "https://www.natomraden.se/",
        "https://brackekommun.ondemand.formpipe.com/committees/kommunfullmaktige/kommunfullmaktige-44332/protocol/protokollpdf?downloadMode=open",
        "https://brackekommun.ondemand.formpipe.com/welcome-sv/namnder-styrelser/kommunfullmaktige/kommunfullmaktige/agenda/tjansteskrivelsepdf-92931?downloadMode=open",
        "https://brackekommun.ondemand.formpipe.com/welcome-sv/namnder-styrelser/kommunfullmaktige/kommunfullmaktige/agenda/kartbilaga-forsaljningpdf?downloadMode=open"
      ],
      "lastCheckedAt": "2026-10-23",
      "lastMaterialUpdateAt": "2026-10-21"
    },
    {
      "id": "prj-verda-sundsvall",
      "name": "Verda AI centre, Sundsvall (Almåsen)",
      "url": "https://datacentersweden.se/projects/verda-sundsvall-almasen/",
      "stage": "announced",
      "municipality": "Sundsvall",
      "county": "Västernorrland County",
      "electricityArea": "SE2",
      "locationAccuracy": "district",
      "lat": 62.39,
      "lon": 17.14,
      "actors": [
        "Verda Cloud Oy",
        "Zoningpartners North AB"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-23",
        "source": "https://verda.com/blog/verda-ai-infrastructure-sundsvall-sweden"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-10-23",
          "evidence": "unclear",
          "source": "https://verda.com/blog/verda-ai-infrastructure-sundsvall-sweden"
        }
      ],
      "gridStatus": "Two 220 kV transmission lines and a 130 kV line run in a corridor south of the plan area, and a 130 kV regional line crosses it. E.ON Energidistribution withdrew its objections in the plan review on 9 October 2026 after an agreement on where a switchgear would be placed. No contracted capacity or connection date is published.",
      "planningStatus": "Detailed plan (case SBN-2025-00470) handled by the urban planning committee on 21 October 2026, item 125, approval ahead of adoption. The approved minutes (§ 125) record the committee's proposal that the council adopt the plan and its decision to remove an incorrect passage about correctional facilities from the plan documents. Municipal executive committee 16 November and council 30 November 2026, according to SVT; the project page also gives 30 November for adoption.",
      "sources": [
        "https://www.natomraden.se/",
        "https://sundsvall.se/download/18.5d1f31c21a163242f96234ea/1792765222132/Protokoll%20Stadsbyggnadsn%C3%A4mnden%202026-10-21.pdf",
        "https://sundsvall.se/download/18.3ef958f71a12f5f33ebd89e8/1792397121536/%C3%84rendelista%20Stadsbyggnadsn%C3%A4mnden%202026-10-21.pdf",
        "https://sundsvall.se/download/18.3ef958f71a12f5f33ebd89e7/1792397114433/M%C3%B6tesbok%20Stadsbyggnadsn%C3%A4mnden%202026-10-21.pdf",
        "https://xn--sundsvallvxer-kfb.se/karta/getfile/3786",
        "https://xn--sundsvallvxer-kfb.se/karta/getfile/3789",
        "https://xn--sundsvallvxer-kfb.se/dpalmasen",
        "https://www.svt.se/nyheter/lokalt/vasternorrland/stadsbyggnadsnamnden-sager-ja-till-industrimark-i-tova",
        "https://sundsvall.se/kommun/nyheter/nyhetsarkiv/2026-02-05-sundsvall-blir-nav-for-europas-nasta-stora-ai-satsning",
        "https://verda.com/blog/verda-ai-infrastructure-sundsvall-sweden",
        "https://www.svt.se/nyheter/lokalt/vasternorrland/slaktgardens-produktiva-jordbruksmark-ska-offras-for-gigantiskt-ai-center-i-tova"
      ],
      "lastCheckedAt": "2026-10-26",
      "lastMaterialUpdateAt": "2026-10-21"
    },
    {
      "id": "prj-edgeconnex-skelleftea",
      "name": "EdgeConneX Skellefteå",
      "url": "https://datacentersweden.se/projects/edgeconnex-skelleftea/",
      "stage": "development",
      "municipality": "Skellefteå",
      "county": "Västerbotten County",
      "electricityArea": "SE1",
      "locationAccuracy": "municipality",
      "lat": 64.75,
      "lon": 20.953,
      "actors": [
        "EdgeConneX"
      ],
      "headlineCapacity": {
        "value": 1000,
        "unit": "MW",
        "metricType": "announced_capacity_unclear",
        "basis": "announced",
        "asOf": "2026-02-27",
        "source": "https://www.edgeconnex.com/news/press-releases/edgeconnex-looks-to-enter-swedish-market-as-part-of-european-data-center-expansion-strategy/"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 1000,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-02-27",
          "evidence": "reported",
          "source": "https://www.edgeconnex.com/news/press-releases/edgeconnex-looks-to-enter-swedish-market-as-part-of-european-data-center-expansion-strategy/"
        },
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "phase",
          "basis": "announced",
          "asOf": "2026-10-20",
          "evidence": "unclear",
          "source": "https://www.svt.se/nyheter/lokalt/vasterbotten/edgeconnex-datacenter-narmar-sig-bygglov-godkant-av-skelleftea-kommun"
        }
      ],
      "gridStatus": "Skellefteå Kraft told SVT in August 2026 that EdgeConneX and Lyten are taking over Northvolt's former grid connections. The contracted capacity is not disclosed.",
      "planningStatus": "Building permit granted 24 September 2026 for DC01 and DC02 (case 2026-3140). According to Norran, a partial start notice covering only the foundations was issued on 29 October 2026. Consultation with the County Administrative Board is reported to run from autumn 2026 to early 2027.",
      "sources": [
        "https://www.natomraden.se/",
        "https://skelleftea.se/download/18.37dfe2e81a0adc9019bf50f/1790595282269/2026-09-28_SAM-2026-3140_96_Kung%C3%B6relse.pdf",
        "https://www.svt.se/nyheter/lokalt/vasterbotten/edgeconnex-datacenter-narmar-sig-bygglov-godkant-av-skelleftea-kommun",
        "https://www.svt.se/nyheter/lokalt/vasterbotten/nya-uppgifter-om-datacentret-i-skelleftea-planerar-sju-byggnader",
        "https://www.svt.se/nyheter/lokalt/vasterbotten/sa-blir-edgeconnex-nya-datacenter-i-skelleftea-tva-byggnader-planeras",
        "https://www.edgeconnex.com/news/press-releases/edgeconnex-looks-to-enter-swedish-market-as-part-of-european-data-center-expansion-strategy/",
        "https://www.norran.se/nyheter/skelleftea/artikel/edgeconnex-har-fatt-startbesked-for-att-paborja-grundarbeten/l61k09wj"
      ],
      "lastCheckedAt": "2026-11-09",
      "lastMaterialUpdateAt": "2026-10-29"
    },
    {
      "id": "prj-meta-lulea",
      "name": "Meta Luleå",
      "url": "https://datacentersweden.se/projects/meta-lulea/",
      "stage": "operational",
      "municipality": "Luleå",
      "county": "Norrbotten County",
      "electricityArea": "SE1",
      "locationAccuracy": "municipality",
      "lat": 65.584,
      "lon": 22.155,
      "actors": [
        "Meta"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://www.metacareers.com/blog/welcome-to-facebook-lulea-sweden/"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 120,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2011-10-27",
          "evidence": "reported",
          "source": "https://phys.org/news/2011-10-arctic-chill-facebook-center-sweden.html"
        },
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://www.metacareers.com/blog/welcome-to-facebook-lulea-sweden/"
        }
      ],
      "gridStatus": "Not separately documented in the cited sources. Operator describes hydropower supply; that is not a published connection agreement.",
      "planningStatus": "Not reviewed as a permit file in this launch set. Existence of the campus is documented by the operator.",
      "sources": [
        "https://www.metacareers.com/blog/welcome-to-facebook-lulea-sweden/",
        "https://phys.org/news/2011-10-arctic-chill-facebook-center-sweden.html",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Lulea-Data-Center.pdf"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2013-06-12"
    },
    {
      "id": "prj-google-horndal",
      "name": "Google Horndal",
      "url": "https://datacentersweden.se/projects/google-horndal/",
      "stage": "construction",
      "municipality": "Avesta",
      "county": "Dalarna County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 60.297,
      "lon": 16.414,
      "actors": [
        "Google"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-11",
        "source": "https://www.datacenters.google/locations/horndal/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-11",
          "evidence": "unclear",
          "source": "https://www.datacenters.google/locations/horndal/"
        }
      ],
      "gridStatus": "Not published as a numbered connection on the cited Google pages. The location page mentions access to clean and reliable electricity. The 2 June 2026 blog’s 700 MW sentence is about Swedish renewable PPAs since 2013, not Horndal site or IT power.",
      "planningStatus": "According to SVT on 2 June 2026, Google has applied for and been granted an environmental permit, a site-works permit (marklov) and a building permit. The permit decisions themselves, with dates and scope, are not read here. Avesta municipality writes that the enquiry came through Business Sweden before Christmas 2014 and that Horndal became the main site during the winter of 2014–2015, partly because of its strong connection to electricity infrastructure.",
      "sources": [
        "https://www.datacenters.google/locations/horndal/",
        "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/blue-yellow-and-green-google-invests-in-its-first-data-center-in-sweden/",
        "https://www.googlecloudpresscorner.com/2026-06-02-Google-Breaks-Ground-on-Data-Center-in-Horndal,-Sweden",
        "https://www.svt.se/nyheter/lokalt/dalarna/beskedet-google-bygger-datacenter-i-horndal",
        "https://avesta.se/-/nyheter/arbete-och-naringsliv/nar-horndal-kom-in-i-bilden/"
      ],
      "lastCheckedAt": "2026-11-11",
      "lastMaterialUpdateAt": "2026-06-02"
    },
    {
      "id": "prj-ms-gavle",
      "name": "Microsoft Gävle",
      "url": "https://datacentersweden.se/projects/microsoft-gavle/",
      "stage": "operational",
      "municipality": "Gävle",
      "county": "Gävleborg County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 60.675,
      "lon": 17.142,
      "actors": [
        "Microsoft"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/"
        }
      ],
      "gridStatus": "Not published in the cited Microsoft materials.",
      "planningStatus": "Not reviewed as a municipal permit file in this launch set.",
      "sources": [
        "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/",
        "https://local.microsoft.com/wp-content/uploads/2024/04/Microsoft-datacenters-in-Sweden.pdf",
        "https://www.natomraden.se/",
        "https://www.svd.se/a/El7Xpa/rattor-och-tuberkulos-pa-svenskt-datacenter"
      ],
      "lastCheckedAt": "2026-11-12",
      "lastMaterialUpdateAt": "2021-11-16"
    },
    {
      "id": "prj-ms-sandviken",
      "name": "Microsoft Sandviken",
      "url": "https://datacentersweden.se/projects/microsoft-sandviken/",
      "stage": "operational",
      "municipality": "Sandviken",
      "county": "Gävleborg County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 60.617,
      "lon": 16.776,
      "actors": [
        "Microsoft"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/"
        }
      ],
      "gridStatus": "Not published in the cited Microsoft materials.",
      "planningStatus": "Not reviewed as a municipal permit file in this launch set.",
      "sources": [
        "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/",
        "https://local.microsoft.com/wp-content/uploads/2024/04/Microsoft-datacenters-in-Sweden.pdf",
        "https://www.natomraden.se/"
      ],
      "lastCheckedAt": "2026-11-12",
      "lastMaterialUpdateAt": "2021-11-16"
    },
    {
      "id": "prj-ms-staffanstorp",
      "name": "Microsoft Staffanstorp",
      "url": "https://datacentersweden.se/projects/microsoft-staffanstorp/",
      "stage": "operational",
      "municipality": "Staffanstorp",
      "county": "Skåne County",
      "electricityArea": "SE4",
      "locationAccuracy": "municipality",
      "lat": 55.643,
      "lon": 13.208,
      "actors": [
        "Microsoft"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/"
        }
      ],
      "gridStatus": "Not published in the cited Microsoft materials.",
      "planningStatus": "Not reviewed as a municipal permit file in this launch set.",
      "sources": [
        "https://news.microsoft.com/europe/2021/11/16/microsoft-opens-its-sustainable-datacenter-region-in-sweden-creating-new-opportunities-for-a-cloud-first-sweden/",
        "https://local.microsoft.com/wp-content/uploads/2024/04/Microsoft-datacenters-in-Sweden.pdf"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2021-11-16"
    },
    {
      "id": "prj-aws-stockholm",
      "name": "AWS Europe (Stockholm)",
      "url": "https://datacentersweden.se/projects/aws-europe-stockholm/",
      "stage": "operational",
      "municipality": "",
      "county": "",
      "electricityArea": "",
      "locationAccuracy": "undisclosed",
      "lat": null,
      "lon": null,
      "actors": [
        "Amazon Web Services"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://aws.amazon.com/blogs/aws/now-open-aws-europe-stockholm-region/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "region",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://aws.amazon.com/blogs/aws/now-open-aws-europe-stockholm-region/"
        }
      ],
      "gridStatus": "Not published on the cited AWS launch pages.",
      "planningStatus": "Not applicable at region level. Individual halls are not mapped here.",
      "sources": [
        "https://aws.amazon.com/blogs/aws/now-open-aws-europe-stockholm-region/",
        "https://press.aboutamazon.com/2018/12/amazon-web-services-launches-new-region-in-sweden"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2018-12-12"
    },
    {
      "id": "prj-ecodc-falun",
      "name": "EcoDataCenter Falun",
      "url": "https://datacentersweden.se/projects/ecodatacenter-falun/",
      "stage": "partially_operational",
      "municipality": "Falun",
      "county": "Dalarna County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 60.607,
      "lon": 15.632,
      "actors": [
        "EcoDataCenter"
      ],
      "headlineCapacity": {
        "value": 41,
        "unit": "MW",
        "metricType": "announced_capacity_unclear",
        "basis": "announced",
        "asOf": "2025-12-31",
        "source": "https://ecodatacenter.tech/hubfs/Annual%20Report%202025_EcoDC%20Holding%20AB_ENG.pdf"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 41,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2025-12-31",
          "evidence": "reported",
          "source": "https://ecodatacenter.tech/hubfs/Annual%20Report%202025_EcoDC%20Holding%20AB_ENG.pdf"
        },
        {
          "metricType": "announced_capacity_unclear",
          "value": 65,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-12-31",
          "evidence": "reported",
          "source": "https://ecodatacenter.tech/hubfs/Annual%20Report%202025_EcoDC%20Holding%20AB_ENG.pdf"
        },
        {
          "metricType": "site_power",
          "value": 80,
          "unit": "MW",
          "scope": "campus",
          "basis": "designed",
          "asOf": "2026-09-10",
          "evidence": "reported",
          "source": "https://ecodatacenter.tech/data-center/ecodatacenter-1"
        }
      ],
      "gridStatus": "A company press item describes securing 80 MW future power supply with Falu Energi & Vatten and Ellevio. That is operator-reported and is not filed here as a reviewed grid agreement.",
      "planningStatus": "Campus is operating and expanding. Individual detailed-plan files were not reviewed for this launch set.",
      "sources": [
        "https://ecodatacenter.tech/hubfs/Annual%20Report%202025_EcoDC%20Holding%20AB_ENG.pdf",
        "https://ecodatacenter.tech/data-center/ecodatacenter-1",
        "https://ecodatacenter.tech/press/ecodatacenter-in-falun-secures-a-future-power-supply-of-80-mw-from-renewable-sources-3229138"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2025-12-31"
    },
    {
      "id": "prj-ecodc-borlange",
      "name": "EcoDataCenter Borlänge",
      "url": "https://datacentersweden.se/projects/ecodatacenter-borlange/",
      "stage": "construction",
      "municipality": "Borlänge",
      "county": "Dalarna County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 60.486,
      "lon": 15.437,
      "actors": [
        "EcoDataCenter",
        "Mistral AI"
      ],
      "headlineCapacity": {
        "value": 250,
        "unit": "MW",
        "metricType": "utility_power",
        "basis": "announced",
        "asOf": "2025-09-24",
        "source": "https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556"
      },
      "metrics": [
        {
          "metricType": "utility_power",
          "value": 250,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2025-09-24",
          "evidence": "reported",
          "source": "https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556"
        }
      ],
      "gridStatus": "Not published as a numbered connection in the cited annual-report extract or the 11 February 2026 partnership notice.",
      "planningStatus": "EcoDataCenter’s release of 24 September 2025 says construction of the Kvarnsveden mega campus has started, with the first data center scheduled for completion in early 2027. The 2026 Mistral notice schedules an opening in 2027. The environmental permit file is not reviewed here.",
      "sources": [
        "https://ecodatacenter.tech/hubfs/Annual%20Report%202025_EcoDC%20Holding%20AB_ENG.pdf",
        "https://ecodatacenter.tech/data-center/ecodatacenter-1",
        "https://ecodatacenter.tech/press/mistral-ai-and-ecodatacenter-partner-to-build-ai-focused-data-center-in-sweden-3431886",
        "https://ecodatacenter.tech/press/ecodatacenter-breaks-ground-on-mega-campus-in-borlnge-3406556"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2026-02-11"
    },
    {
      "id": "prj-atnorth-swe01",
      "name": "atNorth SWE01 Kista",
      "url": "https://datacentersweden.se/projects/atnorth-swe01-kista/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.403,
      "lon": 17.944,
      "actors": [
        "atNorth"
      ],
      "headlineCapacity": {
        "value": 12,
        "unit": "MW",
        "metricType": "site_power",
        "basis": "designed",
        "asOf": "2026-09-10",
        "source": "https://www.atnorth.com/nordic-data-centers/sweden-data-centers/stockholm-metro-site/"
      },
      "metrics": [
        {
          "metricType": "site_power",
          "value": 12,
          "unit": "MW",
          "scope": "campus",
          "basis": "designed",
          "asOf": "2026-09-10",
          "evidence": "reported",
          "source": "https://www.atnorth.com/nordic-data-centers/sweden-data-centers/stockholm-metro-site/"
        }
      ],
      "gridStatus": "Site power capacity is operator-stated at 12 MW. The underlying grid agreement is not published here.",
      "planningStatus": "Operating colocation hall. Permit file not reviewed in this launch set.",
      "sources": [
        "https://www.atnorth.com/nordic-data-centers/sweden-data-centers/stockholm-metro-site/",
        "https://www.atnorth.com/nordic-data-centers/sweden-data-centers/",
        "https://www.atnorth.com/news/cpp-investments-and-equinix-complete-atnorth-acquisition-to-support-growth-of-leading-nordic-data-center-platform/"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2026-09-02"
    },
    {
      "id": "prj-atnorth-swe02",
      "name": "atNorth SWE02 Akalla",
      "url": "https://datacentersweden.se/projects/atnorth-swe02-akalla/",
      "stage": "development",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.414,
      "lon": 17.916,
      "actors": [
        "atNorth"
      ],
      "headlineCapacity": {
        "value": 30,
        "unit": "MW",
        "metricType": "site_power",
        "basis": "announced",
        "asOf": "2026-01-29",
        "source": "https://www.atnorth.com/news/new-30mw-metro-data-center-in-stockholm-sweden/"
      },
      "metrics": [
        {
          "metricType": "site_power",
          "value": 30,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-01-29",
          "evidence": "reported",
          "source": "https://www.atnorth.com/news/new-30mw-metro-data-center-in-stockholm-sweden/"
        }
      ],
      "gridStatus": "The 29 January 2026 notice says Ellevio will construct a new electrical substation. That is operator-reported counterpart language. It is not filed here as a numbered connection agreement or contracted import.",
      "planningStatus": "Target live date Q4 2027 is operator-reported. Building-permit status is not verified here.",
      "sources": [
        "https://www.atnorth.com/nordic-data-centers/sweden-data-centers/",
        "https://www.atnorth.com/news/new-30mw-metro-data-center-in-stockholm-sweden/",
        "https://www.atnorth.com/nordic-data-centers/sweden-data-centers/stockholm-swe02/"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2026-01-29"
    },
    {
      "id": "prj-atnorth-swe04",
      "name": "atNorth SWE04 Sollefteå",
      "url": "https://datacentersweden.se/projects/atnorth-swe04-solleftea/",
      "stage": "development",
      "municipality": "Sollefteå",
      "county": "Västernorrland County",
      "electricityArea": "SE2",
      "locationAccuracy": "municipality",
      "lat": 63.166,
      "lon": 17.271,
      "actors": [
        "atNorth"
      ],
      "headlineCapacity": {
        "value": 300,
        "unit": "MW",
        "metricType": "site_power",
        "basis": "announced",
        "asOf": "2026-02-23",
        "source": "https://www.atnorth.com/news/new-300mw-mega-site-in-solleftea-sweden/"
      },
      "metrics": [
        {
          "metricType": "site_power",
          "value": 300,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-02-23",
          "evidence": "reported",
          "source": "https://www.atnorth.com/news/new-300mw-mega-site-in-solleftea-sweden/"
        },
        {
          "metricType": "utility_power",
          "value": 200,
          "unit": "MW",
          "scope": "campus",
          "basis": "contracted",
          "asOf": "2026-05-28",
          "evidence": "reported",
          "source": "https://www.solleftea.se/energidalen/om-energidalen/nyhetsarkiv/energidalen-nyhetsarkiv/2026-05-28-atnorth-tar-nasta-steg-for-ai-etablering-i-langsele-solleftea"
        }
      ],
      "gridStatus": "On 28 May 2026, Sollefteå municipality reported that E.ON and atNorth had signed a 200 MW connection agreement for Långsele, with operation planned for autumn 2028. This is a public report of a project-specific agreement; the underlying contract has not been reviewed here. It does not establish available power for neighbouring land. On 3 November 2026 Enersense said E.ON Energidistribution had contracted it to build two new 130 kV overhead lines, each about 2.5 kilometres, between the Hamre and Nässe substations, linked to atNorth's planned campus; work starts in November 2026 and is due to be completed in March 2029.",
      "planningStatus": "The notice and a quoted municipal chair say the site is fully zoned and prepared. That wording is not treated here as a reviewed detaljplan file. Permit status is not verified in this register.",
      "sources": [
        "https://www.atnorth.com/nordic-data-centers/sweden-data-centers/",
        "https://www.atnorth.com/news/new-300mw-mega-site-in-solleftea-sweden/",
        "https://www.atnorth.com/news/cpp-investments-and-equinix-complete-atnorth-acquisition-to-support-growth-of-leading-nordic-data-center-platform/",
        "https://www.solleftea.se/energidalen/om-energidalen/nyhetsarkiv/energidalen-nyhetsarkiv/2026-05-28-atnorth-tar-nasta-steg-for-ai-etablering-i-langsele-solleftea",
        "https://via.tt.se/pressmeddelande/4405383/solleftea-blir-ny-nod-for-ai-infrastruktur-eon-ansluter-200-mw?lang=sv&publisherId=1035173",
        "https://enersense.com/releases/enersense-signs-two-power-line-contracts-in-sweden-including-one-supporting-data-centre-development/",
        "https://www.atnorth.com/blog/why-heat-reuse-starts-with-planning/",
        "https://calentix.com/sv/projects/atnorth-swe04-langsele"
      ],
      "lastCheckedAt": "2026-11-05",
      "lastMaterialUpdateAt": "2026-11-04"
    },
    {
      "id": "prj-equinix-sk1",
      "name": "Equinix SK1",
      "url": "https://datacentersweden.se/projects/equinix-sk1/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.362,
      "lon": 17.956,
      "actors": [
        "Equinix"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers/sk1"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers/sk1"
        }
      ],
      "gridStatus": "Not disclosed on the cited Equinix page.",
      "planningStatus": "Operating IBX. Permit file not reviewed here.",
      "sources": [
        "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers/sk1",
        "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": null
    },
    {
      "id": "prj-equinix-sk2",
      "name": "Equinix SK2",
      "url": "https://datacentersweden.se/projects/equinix-sk2/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.264,
      "lon": 18.106,
      "actors": [
        "Equinix"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers/sk2"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers/sk2"
        }
      ],
      "gridStatus": "Not disclosed on the cited Equinix page.",
      "planningStatus": "Operating IBX. Permit file not reviewed here.",
      "sources": [
        "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers/sk2",
        "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": null
    },
    {
      "id": "prj-equinix-sk3",
      "name": "Equinix SK3",
      "url": "https://datacentersweden.se/projects/equinix-sk3/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.384,
      "lon": 17.893,
      "actors": [
        "Equinix"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-20",
        "source": "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers/sk3"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-10-20",
          "evidence": "unclear",
          "source": "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers/sk3"
        }
      ],
      "gridStatus": "Not disclosed on the cited Equinix page.",
      "planningStatus": "Operating IBX. Permit file not reviewed here.",
      "sources": [
        "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers/sk3",
        "https://www.equinix.com/data-centers/europe-colocation/sweden-colocation/stockholm-data-centers"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2026-10-20"
    },
    {
      "id": "prj-conapto-sthlm3-north",
      "name": "Conapto Stockholm 3 North",
      "url": "https://datacentersweden.se/projects/conapto-stockholm-3-north/",
      "stage": "operational",
      "municipality": "Sollentuna",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 59.428,
      "lon": 17.951,
      "actors": [
        "Conapto"
      ],
      "headlineCapacity": {
        "value": 6,
        "unit": "MW",
        "metricType": "announced_capacity_unclear",
        "basis": "announced",
        "asOf": "2026-10-20",
        "source": "https://content.conapto.com/sthlm-3-north"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 6,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-10-20",
          "evidence": "reported",
          "source": "https://content.conapto.com/sthlm-3-north"
        }
      ],
      "gridStatus": "Not published as a connection agreement on the cited data sheet.",
      "planningStatus": "Operating facility. Permit file not reviewed here.",
      "sources": [
        "https://content.conapto.com/sthlm-3-north"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2026-10-20"
    },
    {
      "id": "prj-dlr-stockholm",
      "name": "Digital Realty Stockholm",
      "url": "https://datacentersweden.se/projects/digital-realty-stockholm/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.403,
      "lon": 17.95,
      "actors": [
        "Digital Realty"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "site_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://www.digitalrealty.com/data-centers/emea/stockholm"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 22700,
          "unit": "m2",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "reported",
          "source": "https://www.digitalrealty.com/data-centers/emea/stockholm"
        },
        {
          "metricType": "site_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://www.digitalrealty.com/data-centers/emea/stockholm"
        }
      ],
      "gridStatus": "Not disclosed as MW on the cited campus page.",
      "planningStatus": "Operating campus. Individual permits not reviewed here.",
      "sources": [
        "https://www.digitalrealty.com/data-centers/emea/stockholm"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": null
    },
    {
      "id": "prj-stack-sto01",
      "name": "STACK STO01 Stockholm",
      "url": "https://datacentersweden.se/projects/stack-sto01-stockholm/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 59.33,
      "lon": 18.01,
      "actors": [
        "STACK Infrastructure"
      ],
      "headlineCapacity": {
        "value": 18,
        "unit": "MW",
        "metricType": "announced_capacity_unclear",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://www.stackinfra.com/locations/emea/stockholm/"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 18,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "reported",
          "source": "https://www.stackinfra.com/locations/emea/stockholm/"
        }
      ],
      "gridStatus": "18 MW is operator-stated for the campus. Agreement documents are not published here.",
      "planningStatus": "Operating campus. Permit file not reviewed here.",
      "sources": [
        "https://www.stackinfra.com/locations/emea/stockholm/"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": null
    },
    {
      "id": "prj-bahnhof-pionen",
      "name": "Bahnhof Pionen",
      "url": "https://datacentersweden.se/projects/bahnhof-pionen/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.313,
      "lon": 18.087,
      "actors": [
        "Bahnhof"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://bahnhof.se/foretag/colocation/datacenter/pionen/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://bahnhof.se/foretag/colocation/datacenter/pionen/"
        }
      ],
      "gridStatus": "Not disclosed on the cited Bahnhof pages.",
      "planningStatus": "Operating inner-city hall. Historic shelter conversion is operator-described.",
      "sources": [
        "https://bahnhof.se/foretag/colocation/datacenter/pionen/",
        "https://bahnhof.se/foretag/colocation/colocation-en/",
        "https://www.konkurrensverket.se/globalassets/dokument/konkurrens/beslut/avskrivningsbeslut/26-0677.pdf",
        "https://www.telenor.com/media/newsroom/press-releases/the-swedish-competition-authority-approves-telenor-sweden-s-acquisition/",
        "https://news.cision.com/se/telenor-sverige/r/telenor-sverige-slutfor-forvarvet-av-en-majoritetspost-i-bahnhof-och-lamnar-ett-ovillkorat-kontant-b,c4420866"
      ],
      "lastCheckedAt": "2026-11-06",
      "lastMaterialUpdateAt": "2026-11-06"
    },
    {
      "id": "prj-bahnhof-thule",
      "name": "Bahnhof Thule",
      "url": "https://datacentersweden.se/projects/bahnhof-thule/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.3372,
      "lon": 18.0632,
      "actors": [
        "Bahnhof"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://bahnhof.se/foretag/colocation/colocation-en/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://bahnhof.se/foretag/colocation/colocation-en/"
        }
      ],
      "gridStatus": "Not disclosed on the cited page.",
      "planningStatus": "Operating hall. Permit file not reviewed here.",
      "sources": [
        "https://bahnhof.se/foretag/colocation/datacenter/thule/",
        "https://bahnhof.se/foretag/colocation/colocation-en/",
        "https://www.konkurrensverket.se/globalassets/dokument/konkurrens/beslut/avskrivningsbeslut/26-0677.pdf",
        "https://www.telenor.com/media/newsroom/press-releases/the-swedish-competition-authority-approves-telenor-sweden-s-acquisition/",
        "https://news.cision.com/se/telenor-sverige/r/telenor-sverige-slutfor-forvarvet-av-en-majoritetspost-i-bahnhof-och-lamnar-ett-ovillkorat-kontant-b,c4420866"
      ],
      "lastCheckedAt": "2026-11-06",
      "lastMaterialUpdateAt": "2026-11-06"
    },
    {
      "id": "prj-bahnhof-gullan",
      "name": "Bahnhof Gullan",
      "url": "https://datacentersweden.se/projects/bahnhof-gullan/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.4033,
      "lon": 17.944,
      "actors": [
        "Bahnhof"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-20",
        "source": "https://bahnhof.se/foretag/colocation/datacenter/gullan/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-10-20",
          "evidence": "unclear",
          "source": "https://bahnhof.se/foretag/colocation/datacenter/gullan/"
        }
      ],
      "gridStatus": "Not disclosed on the cited Bahnhof page.",
      "planningStatus": "Operating data center. Permit file not reviewed here.",
      "sources": [
        "https://bahnhof.se/foretag/colocation/datacenter/gullan/",
        "https://bahnhof.se/foretag/colocation/colocation-en/",
        "https://www.konkurrensverket.se/globalassets/dokument/konkurrens/beslut/avskrivningsbeslut/26-0677.pdf",
        "https://www.telenor.com/media/newsroom/press-releases/the-swedish-competition-authority-approves-telenor-sweden-s-acquisition/",
        "https://news.cision.com/se/telenor-sverige/r/telenor-sverige-slutfor-forvarvet-av-en-majoritetspost-i-bahnhof-och-lamnar-ett-ovillkorat-kontant-b,c4420866"
      ],
      "lastCheckedAt": "2026-11-06",
      "lastMaterialUpdateAt": "2026-11-06"
    },
    {
      "id": "prj-bahnhof-st-erik",
      "name": "Bahnhof S:t Erik",
      "url": "https://datacentersweden.se/projects/bahnhof-st-erik/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.35,
      "lon": 18.045,
      "actors": [
        "Bahnhof"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-20",
        "source": "https://bahnhof.se/foretag/colocation/datacenter/st-erik/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-10-20",
          "evidence": "unclear",
          "source": "https://bahnhof.se/foretag/colocation/datacenter/st-erik/"
        }
      ],
      "gridStatus": "Not disclosed on the cited Bahnhof page.",
      "planningStatus": "Operating data center. Permit file not reviewed here.",
      "sources": [
        "https://bahnhof.se/foretag/colocation/datacenter/st-erik/",
        "https://bahnhof.se/foretag/colocation/colocation-en/",
        "https://www.konkurrensverket.se/globalassets/dokument/konkurrens/beslut/avskrivningsbeslut/26-0677.pdf",
        "https://www.telenor.com/media/newsroom/press-releases/the-swedish-competition-authority-approves-telenor-sweden-s-acquisition/",
        "https://news.cision.com/se/telenor-sverige/r/telenor-sverige-slutfor-forvarvet-av-en-majoritetspost-i-bahnhof-och-lamnar-ett-ovillkorat-kontant-b,c4420866"
      ],
      "lastCheckedAt": "2026-11-06",
      "lastMaterialUpdateAt": "2026-11-06"
    },
    {
      "id": "prj-bahnhof-sparven",
      "name": "Bahnhof Sparven",
      "url": "https://datacentersweden.se/projects/bahnhof-sparven/",
      "stage": "operational",
      "municipality": "",
      "county": "Skåne County",
      "electricityArea": "SE4",
      "locationAccuracy": "district",
      "lat": 55.59,
      "lon": 13.038,
      "actors": [
        "Bahnhof"
      ],
      "headlineCapacity": {
        "value": null,
        "unit": "MW",
        "metricType": "it_power",
        "basis": "announced",
        "asOf": "2026-10-20",
        "source": "https://bahnhof.se/foretag/colocation/datacenter/sparven/"
      },
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-10-20",
          "evidence": "unclear",
          "source": "https://bahnhof.se/foretag/colocation/datacenter/sparven/"
        }
      ],
      "gridStatus": "Not disclosed on the cited Bahnhof page.",
      "planningStatus": "Operating data center. Permit file not reviewed here.",
      "sources": [
        "https://bahnhof.se/foretag/colocation/datacenter/sparven/",
        "https://bahnhof.se/foretag/colocation/colocation-en/",
        "https://www.konkurrensverket.se/globalassets/dokument/konkurrens/beslut/avskrivningsbeslut/26-0677.pdf",
        "https://www.telenor.com/media/newsroom/press-releases/the-swedish-competition-authority-approves-telenor-sweden-s-acquisition/",
        "https://news.cision.com/se/telenor-sverige/r/telenor-sverige-slutfor-forvarvet-av-en-majoritetspost-i-bahnhof-och-lamnar-ett-ovillkorat-kontant-b,c4420866"
      ],
      "lastCheckedAt": "2026-11-06",
      "lastMaterialUpdateAt": "2026-11-06"
    },
    {
      "id": "prj-conapto-south",
      "name": "Conapto Stockholm South",
      "url": "https://datacentersweden.se/projects/conapto-stockholm-south/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 59.3,
      "lon": 18.05,
      "actors": [
        "Conapto"
      ],
      "headlineCapacity": {
        "value": 24,
        "unit": "MW",
        "metricType": "site_power",
        "basis": "announced",
        "asOf": "2024-09-05",
        "source": "https://www.mynewsdesk.com/se/conapto/pressreleases/conapto-opens-stockholm-4-south-a-new-sustainable-state-of-the-art-data-center-3341105"
      },
      "metrics": [
        {
          "metricType": "site_power",
          "value": 24,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2024-09-05",
          "evidence": "reported",
          "source": "https://www.mynewsdesk.com/se/conapto/pressreleases/conapto-opens-stockholm-4-south-a-new-sustainable-state-of-the-art-data-center-3341105"
        },
        {
          "metricType": "announced_capacity_unclear",
          "value": 4,
          "unit": "MW",
          "scope": "building",
          "basis": "designed",
          "asOf": "2026-09-10",
          "evidence": "reported",
          "source": "https://content.conapto.com/sthlm-2-south"
        }
      ],
      "gridStatus": "Campus power is operator-stated at 24 MW in the 2024 opening release. Agreement documents are not published here.",
      "planningStatus": "Operating campus after the 2024 opening announcement. Permit files not reviewed here.",
      "sources": [
        "https://www.mynewsdesk.com/se/conapto/pressreleases/conapto-opens-stockholm-4-south-a-new-sustainable-state-of-the-art-data-center-3341105",
        "https://content.conapto.com/sthlm-2-south",
        "https://www.conapto.com/coreweave-partners-with-conapto-to-expand-ai-cloud-capacity/"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2026-06-24"
    },
    {
      "id": "prj-glesys-falkenberg",
      "name": "GleSYS Falkenberg",
      "url": "https://datacentersweden.se/projects/glesys-falkenberg/",
      "stage": "operational",
      "municipality": "Falkenberg",
      "county": "Halland County",
      "electricityArea": "SE4",
      "locationAccuracy": "municipality",
      "lat": 56.905,
      "lon": 12.491,
      "actors": [
        "GleSYS"
      ],
      "headlineCapacity": {
        "value": 5,
        "unit": "MW",
        "metricType": "announced_capacity_unclear",
        "basis": "announced",
        "asOf": "2026-09-10",
        "source": "https://glesys.com/locations/our-data-centers/falkenberg/"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 5,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "reported",
          "source": "https://glesys.com/locations/our-data-centers/falkenberg/"
        },
        {
          "metricType": "utility_power",
          "value": 3,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2020-10-01",
          "evidence": "reported",
          "source": "https://www.mynewsdesk.com/se/glesys/pressreleases/a-unique-venture-surplus-energy-from-a-new-data-center-in-sweden-is-transformed-into-district-heating-3039050"
        }
      ],
      "gridStatus": "Operator now states 5 MW total capacity. The 2020 release stated 3 MW utility power. The difference is unresolved in public wording.",
      "planningStatus": "Operating hall completed around 2020 according to the heat-recovery release.",
      "sources": [
        "https://glesys.com/locations/our-data-centers/falkenberg/",
        "https://www.mynewsdesk.com/se/glesys/pressreleases/a-unique-venture-surplus-energy-from-a-new-data-center-in-sweden-is-transformed-into-district-heating-3039050"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2020-10-01"
    },
    {
      "id": "prj-glesys-stockholm",
      "name": "GleSYS Stockholm",
      "url": "https://datacentersweden.se/projects/glesys-stockholm/",
      "stage": "operational",
      "municipality": "Stockholm",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "district",
      "lat": 59.291,
      "lon": 18,
      "actors": [
        "GleSYS"
      ],
      "headlineCapacity": {
        "value": 1,
        "unit": "MW",
        "metricType": "announced_capacity_unclear",
        "basis": "announced",
        "asOf": "2026-10-28",
        "source": "https://glesys.com/locations/our-data-centers/stockholm/"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 1,
          "unit": "MW",
          "scope": "building",
          "basis": "announced",
          "asOf": "2026-10-28",
          "evidence": "reported",
          "source": "https://glesys.com/locations/our-data-centers/stockholm/"
        }
      ],
      "gridStatus": "Not disclosed on the cited page.",
      "planningStatus": "Operating hall. Permit file not reviewed here.",
      "sources": [
        "https://glesys.com/locations/our-data-centers/stockholm/"
      ],
      "lastCheckedAt": "2026-10-28",
      "lastMaterialUpdateAt": "2026-10-28"
    },
    {
      "id": "prj-evroc-arlanda",
      "name": "evroc Arlandastad",
      "url": "https://datacentersweden.se/projects/evroc-arlandastad/",
      "stage": "construction",
      "municipality": "Sigtuna",
      "county": "Stockholm County",
      "electricityArea": "SE3",
      "locationAccuracy": "municipality",
      "lat": 59.618,
      "lon": 17.93,
      "actors": [
        "evroc"
      ],
      "headlineCapacity": {
        "value": 18,
        "unit": "MW",
        "metricType": "announced_capacity_unclear",
        "basis": "announced",
        "asOf": "2025-02-03",
        "source": "https://evroc.com/news/evroc-finalizes-land-purchase-in-arlandastad-stockholm-marking-key-step-for-the-company-s-flagship-ai-data-center/"
      },
      "metrics": [
        {
          "metricType": "announced_capacity_unclear",
          "value": 16000,
          "unit": "GPU",
          "scope": "campus",
          "basis": "designed",
          "asOf": "2025-02-03",
          "evidence": "reported",
          "source": "https://evroc.com/news/evroc-finalizes-land-purchase-in-arlandastad-stockholm-marking-key-step-for-the-company-s-flagship-ai-data-center/"
        },
        {
          "metricType": "announced_capacity_unclear",
          "value": 10000,
          "unit": "GPU",
          "scope": "campus",
          "basis": "designed",
          "asOf": "2026-10-20",
          "evidence": "reported",
          "source": "https://evroc.com/data-centers/"
        },
        {
          "metricType": "announced_capacity_unclear",
          "value": 18,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2025-02-03",
          "evidence": "reported",
          "source": "https://evroc.com/news/evroc-finalizes-land-purchase-in-arlandastad-stockholm-marking-key-step-for-the-company-s-flagship-ai-data-center/"
        }
      ],
      "gridStatus": "The 3 February 2025 land-purchase release says electricity supply is secured. Supplier, connection capacity and agreement are not published.",
      "planningStatus": "Land / building-rights purchase is operator-reported. Building permit and construction completion are not verified here.",
      "sources": [
        "https://evroc.com/news/evroc-finalizes-land-purchase-in-arlandastad-stockholm-marking-key-step-for-the-company-s-flagship-ai-data-center/",
        "https://evroc.com/data-centers/"
      ],
      "lastCheckedAt": "2026-10-21",
      "lastMaterialUpdateAt": "2026-10-21"
    },
    {
      "id": "prj-hydro66-boden",
      "name": "Hydro66 Svenska, Boden",
      "url": "https://datacentersweden.se/projects/hydro66-boden/",
      "stage": "operational",
      "municipality": "Boden",
      "county": "Norrbotten County",
      "electricityArea": "SE1",
      "locationAccuracy": "municipality",
      "lat": 65.825,
      "lon": 21.689,
      "actors": [
        "Hydro66 Svenska"
      ],
      "headlineCapacity": null,
      "metrics": [
        {
          "metricType": "it_power",
          "value": null,
          "unit": "MW",
          "scope": "campus",
          "basis": "announced",
          "asOf": "2026-09-10",
          "evidence": "unclear",
          "source": "https://letabolag.se/foretag/hydro66-svenska-ab-556967-6686"
        }
      ],
      "gridStatus": "Not found on a current official facility page.",
      "planningStatus": "Company record only. Permit file not reviewed.",
      "sources": [
        "https://letabolag.se/foretag/hydro66-svenska-ab-556967-6686",
        "https://northerndata.de/en/investor-relations/news/northern-data-acquires-data-center-site-in-northern-sweden-fully-powered-by-green-energy",
        "https://www.sec.gov/Archives/edgar/data/1830081/000121390026087311/R26.htm"
      ],
      "lastCheckedAt": "2026-10-20",
      "lastMaterialUpdateAt": "2026-06-26"
    }
  ]
}