Editorial review 2026-09-10 · Jurisdiction: Sweden

Capacity definitions

Stored MW types are IT power, facility power, site power, utility power, and announced capacity with an unclear definition. Original wording is kept. A 41 MW Falun report figure, a 65 MW future campus sentence and an 80 MW “available power” page are three rows. They are not added together. Unknown is null, never zero.

Utility transformers and a web of overhead power lines against a clear sky.
Photo Alivia Alva on Unsplash

General orientation. Assess the specific project separately. Applies to: Anyone who needs to see who publishes DataCenterSweden and how facts are handled.

Summing rules

National totals are therefore not published as a single exact MW number in this launch set.

  • Same metric type.
  • Same scope.
  • No phase plus its parent campus.
  • Show how many rows were excluded as unknown.

Sources

  1. EcoDC Holding AB annual report 2025 (English) EcoDC Holding AB, 2026-04-01. Checked 2026-09-10.
  2. SWE01 Stockholm metro site atNorth, 2026-01-01. Checked 2026-09-10.
  3. Conapto opens Stockholm 4 South Conapto / Mynewsdesk, 2024-09-05. Checked 2026-09-10.

Related